The conceptual stage is where the project’s risk profile is built and inherent safety flexibility is greatest — the FEL 2 package matures the fundamental safety decisions before that flexibility disappears.
- Preliminary Risk Register
- Technological Readiness Level Assessment Report
- Safety Engineering Implementation Plan
- Inherent Safety Review
- HAZID
FEED is where the design basis, key safety decisions and risk controls must reach the maturity EPC execution will be priced and committed on — the FEL 3 package carries the safety deliverables to that maturity.
- Process Safety Philosophy (Revised)
- Layout Safety Review (LSR1)
- Preliminary Flare Radiation and Dispersion Analysis
- HAC and Relevant Compliance Studies
- QRA/FRA
- Fire & Gas Conceptual Design (Philosophy, Mapping, C & E)
- Alarm Management Philosophy
- Functional Safety Management Plan
- Generic SIL Verification
- ToR and Project Based Philosophy Studies for All Safety Related Deliverables
- Functional Safety Assessment 1 (FSA1)
- Process Safety Requirements Specification (SRS)
- FEED Phase PHA (HAZOP, HAZID etc.)
- Target SIL Selection
- Updates of Consolidated Risk Register
- Passive Fire Protection Studies (Philosophy, Envelope, List of Equipment to be Fireproofed)
- Active Fire Fighting System Studies (System Concept, Preliminary Calculations, Technology and Equipment Selection)
- Data Sheet (DS) and Preliminary MR (Material Requisition)
- Safety Critical Element (SCE) Register
- 3-Guide-Word Task Analysis for Preliminary Safety-Critical Operating Procedures
- Initiation of Major Accident Hazard (MAH) Critical Element Performance Standard
- Escape, Evacuation and Rescue Plan
- Preliminary Emergency Response Plan
- Asset Integrity Management Plan (inc. RBI Application Philosophy)
At detailed design the emphasis shifts from choosing the right direction to proving it has been applied consistently — the package delivers the verification and close-out evidence that proof requires.
- Design HAZOP/HAZID
- Safety Final Documentation
- ALARP Demonstration Study Report
- Safety Final Review Report
- 3-D Model Safety Review (LSR2)
- HAC and Relevant Compliance Studies
- Pre-Start-Up Safety Review (PSSR)
- Update of PFP and Other Fire Protection Studies
- Functional Safety Assessment 2 (FSA2)
- Detailed SRS
- Final SIL Verification
- Alarm Rationalization
- Update of Consolidated Risk Register
- Occupied Building Assessment
- QRA (Updated)
- Technical Integrity Verification (TIV) Report for MAH SCE
- Final DS and MR for Safety-Critical Equipment and Instrumentation
- SCE Register (Updated)
- Safety Equipment and Signage Layout
- Human Reliability Assessment (HRA) on MAH Critical Tasks
- Valve Criticality Assessment
- Human Factor Engineering Assessment & Findings Close-Out Report
Owner
Engineering
DSIB supports the project owners in any EPC, EPCM or Engineering-only project with the below scope depending on the engagement model and scope:
- EPC Lifecycle Technical Risk Management Including First-of-Its-Kind Plants
- Governance & Control of Concept, FEED and DE Phase Safety Related Deliverables
- Licensor Package Review and/or Management (All Phases)
- SCE Vendor Package Reviews
- Safety Check Point for DCNs or Requests
- Lifecycle Design Safety Engineering Planning & Control
- Write-Up of Project-Based Process Safety Philosophies and Specifications
- Safety Engineering Domain Consultancy in Digital Twin Projects
- Follow-Up for Third Party Risk and Integrity Solution or Document Providers
DSIB provides a dossier involving the below studies depending on the engagement model and scope:
- Design Specifications for Safety Critical Elements (inc. Templates of DS and MRs)
- Multi-disciplinary Design Safety Procedures as per Each Discipline (Piping, Process, I & C, Static, Rotating, Electrical, Civil)
- Equipment and Application Specific Safeguarding Philosophy
- Functional Safety Management Procedure and the Relevant Plans
- SIS (Safety Instrumented System) Design Specification
- SIS Element Inspection and Relevant Functional Testing Plans
- SCE (Safety Critical Element) Selection, Specification and Verification Procedure
- SRS (Safety Requirements Specification) Write-up Plan
- Alarm Management Procedure (inc. Rationalization Procedure)
- All RBI (Risk Based Inspection) Relevant Procedures
- Emergency Depressurization and Sectionalizing Procedure
- Passive Fire Protection Procedure
- Specifications for Active Fire Fighting System Equipment and Systems
- Fire and Gas System Design Specification
- Gate-Pass Safety Review Execution Plans and Checklists
- Overall Risk-Based Process Safety Management System Handbook
- Further Project-Specific Procedures and Specifications as Required
Depressurization System Safety Review
Some lessons learned from an earlier project of our principals revealing bottlenecks and design errors in depressurization design of a large Turkish chemical plant.
How We Manage Safety Instrumented Functions During Design Phase?
An article from DSIB to raise awareness for functional safety during design.
Multi-Disciplinary FEED Safety Endorsement Before Your EPC Bid
A lump-sum bid prices everything the FEED package says — and everything it doesn't. We review the safety documentation across six engineering disciplines and report what is missing, what is wrong and what it will cost. Before you commit.